Dry Dock Budget & Planning Center
Mini dry-dock planning: project/work-scope selection, interactive budgets, shipyard comparison, cash flow, risks, coating & steel estimators, PMS links — preview of Actinium-sm Dry Dock.
Estimates only. For fleet-grade tracking, use Actinium-sm live records.
Live operation preview
Fleet-grade calculation
PMS health
97.8%
PO cycle
3.2d
CII watch
B
Total Budget
$1.55 M
Budget Variance
-35.2%
Docking Days
14
Work Packages
14
Class Items Due
6
Open Risks
5
Contingency Used
18%
Project Completion
64%
Project & vessel information
Project type
Work scope — repository checklist
Toggle packages like Actinium-sm Dry Dock repository. Budget scales with selection.
Survey / class scope
Interactive cost breakdown
Est. total · COSCO: $1,546,600
- Dock Charges$337,864 · 22%
- Hull Work$105,954 · 7%
- Painting$405,437 · 26%
- Steel$158,931 · 10%
- Machinery$227,045 · 15%
- Electrical$75,682 · 5%
- Accommodation$53,626 · 3%
- Survey$46,336 · 3%
- Contingency$135,725 · 9%
Cost pie
Budget flow (simplified)
Shipyard comparison — killer feature
| Shipyard | Region | Est. Cost | Days | Rating | Distance | Recommendation |
|---|---|---|---|---|---|---|
| COSCO | China | $1.55M | 18 | ★★★★☆ | Medium | Best Value |
| Besiktas | Turkey | $1.47M | 22 | ★★★★★ | Long | Lowest Cost |
| Keppel | Singapore | $1.91M | 15 | ★★★★★ | Medium | Fastest |
| ASRY | Dubai | $1.67M | 17 | ★★★★☆ | Short | Balanced |
| Cochin | India | $1.53M | 20 | ★★★☆☆ | Medium | Regional |
| Hyundai Vinashin | Vietnam | $1.50M | 19 | ★★★★☆ | Long | Value |
Project timeline
Budget health
Approved
$1.62M
Committed
$1.21M
Actual
$1.05M
Forecast
$1.48M
Variance
-35.2%
Cash flow
Project risk heat map
- Steel RenewalHIGH
- Spare DelayMEDIUM
- Class SurveyLOW
- Weather DelayLOW
AI recommendations
- Hull blasting can wait on selected tanks → save ~$40,000
- Propeller polishing recommended → ~2% fuel saving · ROI ~4 months
- Replace vs repair on selected valves → cost difference ~$5,000 (prefer replace)
PMS integration — overdue / due jobs
Pull live overdue PMS into dry dock scope in Actinium-sm.
Machinery cost (repository)
- Main Engine$120,000
- Generators$38,000
- Cargo Pumps$70,000
- Boiler$18,000
- Steering$25,000
- Deck Crane$22,000
Hull coating calculator
Paint ~4,500 L · $201,000
Steel renewal estimator
Weight ~19.8 t · $101,413
Actinium-SM dry dock workflow
Cost codes → RFQ → yard compare → PO → VO → final cost — this page is a preview of the full module.
AI planning assistant
Knowledge centre
Related free tools
Download centre
FAQ — dry dock planning
Is this a contractual yard quotation?
No. Screening estimate only. Actinium-sm RFQ + cost codes + technical evaluation produce tender-grade numbers.
Why shipyard comparison?
Owners choose on cost, days, quality and logistics — side-by-side compare is the buying decision, not a single lump sum.
How does PMS feed dry dock?
Overdue/due jobs and survey items become work packages → budget lines → RFQs, then close-out lessons learned.
Run this across your fleet in Actinium-sm
Superintendents use Actinium-sm for live vessel data, PMS, dry dock budgets, CII monitoring, PSC/SIRE readiness, and purchase quote comparison — with cloud office and offline ship sync.